| MaP3 | |||||
| METHOD | PROJECTS | TEAM | NEWS | ||
|
Chengdu station Buildings Bridges - footbridges Pylons |
|
|
|
|
Client : Chinese ministery of rail roads Project managers : AREP (Paris) – N°2 Institute (Chengdu) - Xi Nan Yuen (Chengdu) - MaP3 (Structural engineer) - SNCF-IGOA (Bridge Engineer) Construction : CSCEC Technical information : Superficy : 90 000 m2, Metallic roofing weight : 9 000 tons Completion : 2010 This project was accepted after a 3 phases competition which started in 2007. MaP3 participated in the design and calculation of the roof structure, and the railroad bridges in cooperation with IGOA bridge engineers. |
|